Basement: Daylight, Full, Fully Finished, Interior Access, Outside Entrance, Walkout Level
Construction Materials: Brick, Brick Front
Cooling: Ceiling Fan(s), Central A/C
Elementary School: SPRING HILL
Exterior Features: Extensive Hardscape, Exterior Lighting, Flood Lights, Water Falls, Water Fountains
Foundation Details: Slab
Heating: Forced Air, Heat Pump(s)
High School: LANGLEY
Lot Features: Additional Lot(s), Adjoins - Open Space, Backs to Trees, Landscaping, Level, No Thru Street, Private, Rear Yard, Trees/Wooded
Middle Or Junior School: COOPER
Other Structures: Above Grade, Below Grade
Parking Features: Asphalt Driveway, ElectricVehicleChargingStations
Water Source: Public